A vision for the future

A vision for the future

1
2
3
4
5
6
7
8
9
10
11

TODAY

  1. Current steel mill
  2. Rolling mill & bar finishing
  3. Wire mills
  4. Wire finishing

By 2028

  1. Scrap
  2. New steel mill
  3. Continuous casting
  4. Slab reheating furnaces
  5. Hot rolling mill
  6. Coilers
  7. Finished products
[

OUR site will be transformed with a focus on sustainability and energy efficiency, producing steel from scrap and low-emission direct reduced iron. Hot rolled coils production is scheduled to start by 2028

]